February 22, 2012


Our grand plan for the house
We have a very long "to do" list -- but here are the biggies:
  • no more pink bathroom
  • new furnace with second heating zone 
  • all new electrical and lighting throughout the house
  • alot of new plumbing
  • lots of new insulation
  • brand new roof with a very long warranty
  • brand new four hundred square foot master suite with private bath
  • huge open concept living, dining, kitchen space w/fireplace and hardwood floors
  • a brand new kitchen with stone (maybe marble?) countertops, center island, hardwood floors and all new stainless steel appliances.
  • two new bathrooms (3 total)
  • second floor laundry with brand new washer and dryer
  • new patio and landscaping
  • interior and Exterior paint
  • new automatic garage door
  • renovated sunroom with new hardwood floors
  • renovated front entryway with carrara marble tile and a beautiful new front door
Here are a few pictures of what things looked like on day one:





breezeway (aka new sunroom)

We hope you'll follow along on the progress and let us know what you think about our design ideas.  

No comments:

Post a Comment